![]() No more than two employees should occupy suspension scaffolds designed for a working load of 500 pounds (non-mandatory).Be secured against movement by tiebacks installed at right angles to the face of the building or structure ( 5 & 6), or by opposing angle tiebacks installed and secured to a structurally sound point of anchorage (structurally sound points of anchorage include structural members, but not vents, electrical conduit, or standpipes and other piping systems).Or 1½ times the stall capacity of the hoist.Rest on surfaces capable of supporting at least 4 times the load imposed on them by the scaffold operating at the greater of either :.All suspension scaffold support devices, such as outrigger beams, cornice hooks, and parapet clamps, must:.Or 2 times the stall load of the hoist.Each suspension rope, including connecting hardware, must be capable of supporting, without failure, at least 6 times the maximum intended load applied to that rope while the scaffold is operating at the greater of either :.Scaffolds and scaffold components must be capable of supporting, without failure, their own weight and at least 4 times their maximum intended load.įoreman Dies When Overloaded Scaffold Falls Counterweights must not be removed from an outrigger beam until the scaffold is disassembled.Counterweights must be secured by mechanical means to the outrigger beams (Figures 2 & 3) to prevent accidental displacement.Counterweights must not be made of flowable materials such as sand, gravel, and similar materials that can be easily dislocated.Masonry units, rolls of roofing felt, and other similar construction materials shall not be used as counterweights.Only items specifically designed as counterweights may be used to counterweight scaffold systems.Or a minimum of 1½ times the tipping moment imposed by the scaffold when it is operating at the stall load of the hoist, whichever is greater.At least 4 times the tipping moment imposed by the scaffold when it is operating at the rated load of the hoist.Counterweights used to balance adjustable suspension scaffolds must be capable of resisting :.Or bolts or other direct connections to the floor or deck.Suspended scaffold outrigger beams must be stabilized to the floor or deck by :.We pride ourselves on a personalized quality service and our aim is to exceed our customer's expectations every time.Inadequate Counterweights Cause Two Deaths This reflects our customers confidence in our consistently high levels of safety, quality and service. We know that satisfied customers are our future and a large part of our work is repeat business. We only employ 100% direct employees and qualified operatives, most of whom have been with the company for many years. Once erected the scaffold can be easily adapted by sliding the telescopic transoms either in or out with up to three inside boards between inside standards and face the building. We do not use light tubes as these weigh we deem them to be too weak this was the main reason we adopted the current way of working. Our business is based round the materials that are stored in bins and are loaded by forklift in our yards and unloaded on site by our Truck mounted Booms. This forms the basis of the NY Scaffolds motto safety speed efficiency. NY Scaffold is fully self sufficient and one the largest stockholders of the sidewalk bridge system within the US. We are totally focused on customer satisfaction and pride ourselves on the range of services we provide, We have 95% repeat business on an ongoing basis. NY Scaffold is the leading specialty Scaffold Erector Company covering the whole of the US. The system’s optimum design offers a high load rating and extreme rigidity, keeping your workers secure and productive. Only five main components are required for basic use and the only erection tools required are a hammer and level. With eight completely variable component node points and the largest available bay sizes, Our Scaffolding offers the most flexible system. Our Scaffolding has several unique safety features that benefit the system’s erectors, users and project inspectors. Significant reductions in total required components, resulting in savings in storage, handling and transportation. Undoubtedly the fastest steel scaffold system available with production output recorded as the Official World Record*.Ī fully hot-dipped galvanized system offering all the well-recognized benefits of this treatment method.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |